City News


Back to City News

Sep
16
2016
City of Yuma Road Report, Sept. 16

A weekly list of City projects or encroachment permits authorized by the City of Yuma affecting busy streets.

16th Street and 4th Avenue

Construction for the 16th Street and 4th Avenue intersection improvements project is under way. The current phase of work reduces 16th Street to one lane of through traffic in each direction, with the left turn lanes still open to access 4th Avenue. Northbound and southbound lanes on 4th Avenue are restricted to one lane on their respective approaches to the intersection. Right turn restrictions remain in place for large trucks and semitrailers.

The City asks all motorists to plan ahead and to obey the reduced speed limit. While business access will be maintained at all times, those seeking through traffic routes may wish to avoid the construction zone, using roads such as 24th Street, 8th Street or 32nd Street for east-west through traffic, and Arizona Avenue, Avenue A, Pacific Avenue or Avenue B for north-south through traffic. 

STREETLIGHT OUTAGES: The City advises travelers that power to a number of streetlights in the vicinity of the 16th Street and 4th Avenue intersection have been de-energized due to safety concerns, and due to their pending replacement that will come during a later project phase. Please use extra caution when looking for pedestrians and bicyclists in the area.

WATER PRESSURE: The City would like to remind the public that lower than normal water pressures may be experienced as parts of the City's old water system are being prepared for replacement by a new system, between now and then end of October. Lower than normal water pressure may be experienced during peak morning hours of 6 a.m. to 9 a.m. and in the afternoon between 4 p.m. and 7 p.m. The areas most likely to be impacted are those from the East Main Canal to just west of 4th Avenue, from 12th Street to 24th Street.

 

24th Street, avenues B-C

The street reconstruction of 24th Street from Avenue B to Avenue C is under way. The first phase of the 120-day project will require a closure at 24th Street, from Avenue B to the driveway of the daycare business to the west. Access to the daycare center should be from eastbound 24th Street, either from Avenue C or 31st Drive. Detour routes include 28th Street, 20th Street, and 32nd Street. Work will then move west along 24th Street to Avenue C. 

 

8th Avenue and 28th Street

The traffic signal at the 8th Avenue and 28th Street intersection is currently inactive and has been replaced with temporary stop signs indicating a 4-way stop. The intersection will be converted to a two-way stop within the following weeks, and the inactive traffic signal will be removed from the area. Motorists are asked to obey the temporary stop signs that have been put in place at the intersection.

 

Castle Dome Avenue

A 60-day project will require shoulder work on Castle Dome Avenue and its adjacent sidewalk. Signs will be posted in the area to let drivers know of the roadwork as they approach. Work will be completed by the first week of November.

 

U.S. 95 at Fortuna Wash - ADOT

Work is under way on the $9.3 million bridge on U.S. Highway 95 spanning Fortuna Wash northeast of Yuma and is expected to be completed by next winter. The bridge is going in at milepost 34, approximately 12 miles northeast of Yuma and 10 miles south of the turnoff (Imperial Dam Road) to Yuma Proving Ground. Crews are scheduled to work weekdays between 6 a.m. and 4 p.m. Motorists should allow extra travel time as lane restrictions will be in place and flaggers will occasionally need to alternate traffic through the work zone.

 

West Main Canal, Avenue B - 1st Street

The Arizona Department of Transportation (ADOT) is administering a project to construct a paved pathway, lighting and rest stops along the West Main Canal. The project will require the closure of the canal banks until this fall. Crews will be working along the north bank of the canal between 1st and 3rd streets, from Avenue A to Avenue B. Work will be done from 5 a.m. to 2:30 p.m. on weekdays. This project is to be completed near the end of 2016. 

 

Maiden Lane, 1st-2nd streets

Maiden Lane is closed to traffic from 1st Street to 2nd Street 7 a.m. and 5 p.m. Monday through Friday.

 

Pecan Grove, 3rd Street

The Pecan Grove neighborhood waterline replacement project takes place south of 3rd Street on various side streets between 24th Avenue and Avenue B. Project is expected to continue into early autumn. Currently, there are road closures in place in the following locations: along 4th Place, between Avenue B and 24th Avenue; along 5th Street, between Avenue B and 24th Avenue; and on 24th Avenue, between 4th and 5th streets.

 

City Street Maintenance

Asphalt maintenance crews will conduct operations in various locations as needed the week of Sept. 19-23.

  • Orange Avenue and 3rd Avenue (grinding)
  • Vista Del Sol subdivision (South Frontage Road to 38th Lane)(crack seal)
  • Las Casitas subdivisions 1 and 2 (crack seal)